Nalcor Energy > About > Transparency & Accountability > ATIPPA > Responses

Nalcor believes the sharing of information is an important part of openly engaging the public and creating a broader understanding of the company’s core businesses and operations. As part of our continued commitment to transparency and accountability, Nalcor provides the people of Newfoundland and Labrador with access to information about completed requests made under the Access to Information and Protection of Privacy Act.

The online posting is a summary of the information requested and responded to since January 1, 2015 by Nalcor and all if its lines of business. The postings apply to access requests received for general information and any personal information requested by individuals is not included. Responses will be published following a 72-hour period after the response is sent electronically to the applicant, or five days in the case where the records are mailed to the applicant.

The posting of completed access requests includes:

  • the file number and summary of each request;
  • the line of business responsible;
  • a copy of the final response letter to the applicant with all personal information removed; and
  • a copy of the responsive records. Any personal information is removed as this is protected under section 40 of the Access to Information and Protection of Privacy Act.

Under the Energy Corporation Act, Nalcor’s mandate is to ensure the province obtains maximum benefits from Newfoundland and Labrador’s natural resources. The success of Nalcor and its lines of business have a direct impact on the people of the province. Therefore, it is our responsibility to keep the public fully informed on our operations and business objectives. By providing access to the responses made under the Access to Information and Protection of Privacy Act, we are enhancing public awareness and understanding of the types of information Nalcor holds.

Completed Access to Information Requests

Keyword Search:
Request NumberRequest SummaryRequest DateDepartment
PB-812-2018Is there sufficient transmission line capacity to bring 300 MW of Nova Scotia Maritime Link power to the Avalon if needed during the winter due to LIL failure?10/29/2018Nalcor Energy
PB-786-2018What is the impact on DG3 CPW for not using actual cash costs for PPA (Muskrat Falls site, LTA)? And is TL on a COS basis?10/22/2018Nalcor Energy - Lower Churchill Project
PB-787-2018Does the obligation by Nalcor to provide open access to its transmission facilities mean that Hydro Quebec can sell power directly to NL Power; Industrial customers in Labrador; Industrial customers on the island?10/22/2018Nalcor Energy
PB-748-2018How much money has been spent on Gull Island to date with regards to land clearing, road construction and any other preliminary related infrastructure at Gull Island by Nalcor?10/9/2018Nalcor Energy
PB-749-2018Please provide the current Astaldi estimate for the completed Muskrat Falls contract and outline the changes by date and dollar amount from the original $1.1B contract to show how Astaldi then arrived at the current estimate. Please provide detailed reasons for each of the changes.10/9/2018Nalcor Energy - Lower Churchill Project
PB-731-2018Please provide a complete list of business financial assistance programs. For 2015, 2016 and 2017 please include the name of the program, total budget, total marketing spending, total number of private sector companies and self employed individuals who applied for funding based on company size, total who received funding and the total approved funding.10/1/2018Nalcor Energy
PB-735-2018Has the cost to purchase the 76MW to fill the LIL line been costed in the Muskrat Falls power rates and please provide the cost of this per year for 50 years.
Please provide information per year for 2021-2081 on Muskrat Falls PPA and LIL payments as well as total payment for Muskrat Falls; Muskrat Falls energy in kwh delivered to Holyrood as UC (76MW) recall energy from the Upper Churchill, for Nova Scotia, NLH and total; Cost per kwh delivered to Holyrood for NLH, Nova Power, UC (recall 76 MW) and total.
10/1/2018Nalcor Energy - Lower Churchill Project
PB-736-2018Based on the projected Muskrat Falls cost of $12.7B please provide by year from 2021 to 2081 the projected customer retail power rate (including HST) in cents/kwh and the projected Nalcor profit per kwh included in the customer retail rate in cents/kwh (in cents per customer retail rate kwh).10/1/2018Nalcor Energy - Lower Churchill Project; NL Hydro
PB-716-2018Please provide the Manitoba Hydro International (MHI) Decision Gate 3 (DG3) report on Muskrat Falls. How much could the cumulative percent worth (CPW) for the isolated option be reduced if the unnecessary Holyrood SO environmental work was eliminated?09/24/2018Nalcor Energy - Lower Churchill Project
PB-698-2018Please provide the report(s) on the hydro peaking unit capacity at Bay d'Espoir and Cat Arm.09/17/2018Nalcor Energy - Lower Churchill Project
PB-697-2018Please provide multiple projections for the years 2019-70, including load growth projections used by Nalcor, revised revenue requirements and the AFUDC for Muskrat Falls, LTA and LIL, among others.09/12/2018Nalcor Energy
PB-651-2018Without releasing any privileged contractual information please provide Contract 2018-73829JW that Nalcor awarded to Johnson Controls on July 3, 2018. 08/27/2018Nalcor Energy - Churchill Falls
PB-683-2018Please provide the contracts that Nalcor and its affiliates has or have had with Johnson Controls for the period of January 2978 to present.08/20/2018Nalcor Energy
PB-597-2018Request for all data on wiring and fiber optic cabling/data interconnection and terminations within your department from May 1, 2016 to current. 08/2/2018Nalcor Energy
PB – 583 – 2018Please provide a copy of any report(s) prepared by Thierry Vandal that were filed in Quebec Superior Court with the file number 500-17-078217-133.07/27/2018Nalcor Energy - Churchill Falls
PB-577-2018Requesting all information and documents provided to Nalcor Energy from Emera Inc. in relation to the Maritime Link Project.07/24/2018Nalcor Energy
PB-574-2018Please provide all records related to Rate Mitigation from the last 18 months including any studies or reports on the various options being considered by Nalcor.07/23/2018Nalcor Energy - Lower Churchill Project
PB-567-2018Please provide an updated version of the documents provided in response to File # PB-443-2017, including updated end dates for embedded contractors on the Lower Churchill Project, hours billed to present and total amounts paid to each contractor.07/20/2018Nalcor Energy - Lower Churchill Project
PB – 553 – 2018Please update the table in PB-91-2018 with a column for fringe benefits for the 17 staff in Corporate Services, Financial Services and Regulatory Affairs for NLH. Please provide by position for the last 5 years.07/16/2018NL Hydro
PB-541-2018Please provide an updated table showing the data behind Figure 1 of the November 10, 2011 Submission to the Public Utilities Board for the period 1970 to 2017, separating out residential, general service and industry load served by each of NLH and NP.07/9/2018NL Hydro
PB-540-2018Please provide the most recent report comparing Nalcor salaries and benefits to the other Atlantic provinces utilities. Please do the same for NL Hydro. Also, please provide the most recent report comparing NL Hydro salaries and benefits to NL Power.07/6/2018Nalcor Energy and NL Hydro
PB – 506 – 2018Please provide the mandated document provided by Nalcor which outlines that the Independent Engineer (IE) that Nalcor has no contractual or other relationship with the IE other than the obligation to pay the fees of the IE.06/29/2018Lower Churchill Project
PB – 499 -2018Which company/companies was awarded and/or performed the works associated with Nalcor RFP SH0051?06/27/2018Lower Churchill Project
PB-491-2018Request for notes of a meeting held by former CEO Ed Martin with senior executives on April 14, 2011 to discuss Muskrat Falls.06/22/2018Nalcor Energy, Lower Churchill Project
PB-402-2018Please provide all data connected with these new boreholes and any analysis done by Nalcor or their contractors/experts on the soil/material contained within the core samples.05/30/2018Nalcor Energy, Lower Churchill Project
PB-242-2018Please provide information on government's invested equity.
03/19/2018Nalcor Energy, Lower Churchill Project
PB-231-2018All documents and correspondence created between January 01, 2011 - Dec 31, 2011 between Ed Martin, Gil Bennett, Rob Henderson and between all officers and directors of Nalcor and subsidiaries re the MF PUB terms of reference.03/19/2018Nalcor Energy, Lower Churchill Project
PB-200-2018All documentation
- relating to the need for and methods of Muskrat Falls power rate mitigation, including estimates of amounts required and sources of funding
-surrounding implications for water management and MF power output should the Quebec court decision interpreting the exercise of the 25 year option under the Upper Churchill Contract remain in effect
03/6/2018Lower Churchill Project
PB-173-2018Information related to Geotechnical Peer Review of Dr S Bernander's Reports and Analysis of the North Spur.
02/26/2018Nalcor Energy, Lower Churchill Project
PB-149-20181. When will Nalcor make the LIL a regulated utility?
2. Does Nalcor plan on making the MF site / LTA a regulated utility?
3. Re: Section 5.13 Emera ROE True Up does this clause require Nalcor to pay Emera if their LIL ROE is less than 8.5% over the life of the LIL agreement?
02/20/2018Nalcor Energy, Lower Churchill Project
PB-148-2018Provide re Nalcor/Emera MF LIL agreements-
All emails between Jan 1, 2012 - Dec 31, 2014 between Ed Martin, Gil Bennett, Rob Hull, Peter Hickman and between all officers and directors and subsidiaries including the NL Gov re the Nalcor/Emera MF LIL agreements
02/20/2018Nalcor Energy, Lower Churchill Project
PB-154-20181. Why doesn't Emera pay corporate income taxes from 2018 - 2037 on the LIL?
2. Is Emera reimbursed its corporate income taxes by Nalcor from 2018-2037 on the LIL?
3. If yes, provide the Emera corporate tax reimbursement per year from 2018-2037 by Nalcor to Emera on the LIL?
02/19/2018Nalcor Energy
PB-144-2018 and PB-147-2018PB-144-2018
Please provide a copy of the source data and mathematical calculations used to produce the dollar amount shown in the spreadsheet included in ATIPPA file #PB-651-2017

PB-147-2018
Please provide a copy of the source data and mathematical calculations used to produce each dollar amount shown in the spreadsheet included in ATIPPA file #PB-555-2017
02/19/2018Nalcor Energy, Lower Churchill Project
PB-150-2018Information regarding Section 5.15 Tax Adjustment True Up02/19/2018Nalcor Energy, Lower Churchill Project
PB-129-2018Concerns, questions and complaints from workers, government and community members regarding hiring by recruitment agencies at the MF Lower Churchill project.
Results of all internal investigations initiated by concerns, questions or complaints about hiring by recruitment agencies at the MF Lower Churchill project.
02/14/2018Nalcor Energy, Lower Churchill Project
PB-126-2018Provide by year from 2018-2060 Nalcor's cash received from its Hebron 4.9% equity stake.
Provide an update to the equity cost of $110M and another $650 million that came at a cost of $110 million for the original buy-in and another $650 million for pre production and construction costs
Provide by year from 2018-2060 Hebron royalties paid to the NL Govt.
02/12/2018Nalcor Energy
PB-114-2018Provide explanation for 180 employees increase Mar 31, 2017 to Sept 30, 2017
Provide detailed breakdown by subsidiary with comparative breakdown for September 30 and March 30
02/8/2018Nalcor Energy
PB-65-20181. Provide the page number in LIL agreement on an estimate of Emera's total income tax costs has been included in the projected MF power rates but it has not been broken down between the federal and provincial components
2.Had Nalcor advised the NL Gov that the LIL NL income taxes paid by Emera can be used to mitigate MF rates
02/1/2018Nalcor Energy, Lower Churchill Project
PB-97-2018A list of items purchased from Grand and Toy from August 1, 2017 - December 31, 2017. 01/30/2018Nalcor Energy, Lower Churchill Project
PB-91-2018For the 17 staff in Corporate Services, Financial Services, Regulatory Affairs for NLH, please provide by position for last 5 years:
a)annual salary b)overtime c)bonus d)total cost (also provide column totals down)
For Corporate Services, Regulatory affairs and Financial services for NLH, please provide total expenses by year for the last five years
01/29/2018NL Hydro
PB-74-2018Copies of the Corporation's records and files pertaining to the extension of the main electrical distribution line located on route 92 (North Harbour Road) and within the community infilling limits of a municipality at Branch, NL.01/24/2018Nalcor Energy, NL Hydro
PB-62-20181. Provide details of why Emera's net income is 1.51 cents per kwh
2. Provide net income per year in cents per kwh for Emera and for Nalcor for the first 50 years of the MF project
3. Provide net income per year for Emera and Nalcor for the first 50 years of the MF project
01/22/2018Nalcor Energy, Lower Churchill Project
PB-61-2018Provide the corporate tax rate use for Emera for the first 5 years of the LIL.
Provide the corporate taxes in $ included in MF power rates by year for the first 5 years,
01/22/2018Nalcor Energy, Lower Churchill Project
PB-56-2018Provide the LIL cost of Emera's total income tax cost by year - from 2018-2072
Provide the rate per kwh for Emera's LIL income taxes per year from 2018-2072
01/19/2018Nalcor Energy, Lower Churchill Project
PB-55-2018Please provide a copy of the Collateral Agency Agreement referred to in the 29 November 2013 MF Equity Support Agreement.01/19/2018Nalcor Energy, Lower Churchill Project
PB-33-2018Please provide:
1. The forecast energy sales of MF power on the island, in Labrador and externally
2. The ROE for each of the MF assets and Labrador transmission assets, corresponding with the information for the LIL provided in PB-740-2017
3. The depreciation allowances included in revenue requirements for each of MF, LTA and LIL
4. The operating and maintenance costs for each of MF, LTA and LIL
5. The fuel costs for each year.
01/15/2018Nalcor Energy, Lower Churchill Project
PB-31-2018Based on a $12.7B MF cost, update the 36.1 cents per kwh.01/15/2018Nalcor Energy, Lower Churchill Project
PB-32-2018Has the cost to purchase the 76 MW to fill the LIL line been costed in the MF power rates?
Provide the cost per year for 50 years to purchase this 76 MW need to fill the 900 MW LIL
01/15/2018Nalcor Energy, Lower Churchill Project
PB-846-2017Payments following the commissioning of the Muskrat Falls Generating Plant, the Labrador-Island Link and Labrador Transmission assets that occur between Nalcor, Emera and/or subsidiaries of Emera pursuant to the November 29, 2013 agreement. 11/20/2017Lower Churchill Project
PB-771-2017The English translation of the Memoire de L'Intimee filed by Hydro Quebec in the Supreme Court of Canada proceeding the case number 37238. 10/23/2017Churchill Falls
PB-756-2017 and PB-759-2017Daily environmental reports that reference sightings, interactions and consequences that relate to black bear encounters and relocation efforts as part of the construction of the Lower Churchill Project.

All date related to Furbearer sightings and interactions for the Lower Churchill Project.
10/20/2017Lower Churchill Project
PB-757-2017Pre-impoundment beaver colony surveys for the Lower Churchill Project and related data and correspondence. 10/20/2017Lower Churchill Project
PB-760-2017All GHG activity data from the reporting of fuel consumption for the Lower Churchill Project. 10/20/2017Lower Churchill Project
PB-763-2017Telemetry collar data of Collard Caribou with buffers around the Lower Churchill Project Footprint. 10/20/2017Lower Churchill Project
PB-740-2017For the Labrador-Island Link provide for each year from 2021 to 2070 the return on equity and the amount for Emera and the return on equity and the amount for Nalcor. 10/12/2017Lower Churchill Project
PB-702-2017Annual MFLTA payment, annual Labrador-Island-Link payment and total of those payments for each year from 2012 to 2069. 09/26/2017Lower Churchill Project
PB-693-2017Data relating to ice thickness on the Churchill river downstream of Muskrat Falls. 09/18/2017Lower Churchill Project
PB-651-2017Cost projections for Muskrat Falls. 09/5/2017Lower Churchill Project
PB-650-2017A list of items purchased from Grand and Toy Limited for the Lower Churchill Project between June 1, 2017 and July 31, 2017. 08/30/2017Lower Churchill Project
PB/635/2017Any and all communications to/from Stan Marshall and/or Jim Haynes from January 1, 2017, to present regarding rate mitigation. 08/25/2017Nalcor Energy, NL Hydro
PB/638/2017Any and all communications to/from Gilbert Bennett regarding methylmercury in Lake Melville for the period of May 1, 2017 to present. 08/25/2017Lower Churchill Project
PB-633-2017Any documents showing potential future revenue from the Lower Churchill Project (Phase 1) for January 1, 2013 to present. 08/25/2017Lower Churchill Project
PB-634-2017Any and all communication to/from Stan Marshall from January 1, 2017 to present regarding US energy markets. 08/25/2017Nalcor Energy
PB-636-2017A list of recorded incidents for the Lower Churchill Project resulting in lost-time injuries. 08/25/2017Lower Churchill Project
PB-637-2017A list of all meetings and scheduled calls between Stan Marshall and Premier Dwight Ball and Stan Marshall and Siobhan Coady from January 1, 2017 to present. 08/25/2017Nalcor Energy
PB-639-2017Any and all communication to/from Stan Marshall and/or Jim Haynes from January 1, 2017 to present regarding interconnection of the Island Interconnected System and the North American electrical GRID in relation to cyber security. 08/25/2017Nalcor Energy
PB-602-2017A complete list of contractors employed on the Lower Churchill Project (Phase 1), showing the amount paid to each contractor to date. 08/18/2017Lower Churchill Project
PB/556/2017Internal assessment of Mud Lake flooding. 08/15/2017Lower Churchill Project
PB/592/2017All information relating to bonds set aside for loss of Habitat under Environmental Assessment for the Lower Churchill Project. 08/15/2017Lower Churchill Project
PB/563/2017Briefing notes and information relating to Terra Nova/Suncor Energy royalty regime. 08/9/2017Nalcor Energy, Oil and Gas
PB-555-2017Request for equity return details as outlined in the 2015 budget speech. 08/3/2017Nalcor Energy
PB/491/2017Nalcor Energy procurement policies from 2010 to 2017.07/12/2017Nalcor Energy
PB/492/2017Organizational charts for the Lower Churchill Management Corporation Delivery Team fro 2016 and 2017. 07/12/2017Lower Chuchill Project
PB/450/2017Cell phone bills for Stan Marshall since April 2016. 06/29/2017Nalcor Energy
PB-441-2017A list of all contracts awarded by Nalcor Energy and any of its subsidiaries for any part of the Lower Churchill Project, along with the company the contract was awarded to, the awarded value of the contract, and the final total amount paid out for all contracts that have been completed. 06/28/2017Nalcor Energy, Lowerr Churchill Project
PB/443/2017List of people who have done work for Nalcor or any of its subsidiaries on a professional services contract between 2010 and 2017. 06/28/2017Nalcor Energy
PB/382/2017The Lower Churchill Project Impacts and Benefits Agreements. 06/15/2017Lower Churchill Project
PB/396/2017A list of items purchased from Grand and Toy Limited for the period from October 1, 2016 to May 31, 2017 restricted to items purchased by Muskrat Falls Corporation. 06/15/2017Lower Churchill Project
PB/234/2017Any and all records relating to clean up, removal and remediation of the site of the former Newfoundland Hydro diesel generating plant in Rencontre East. 05/15/2017Newfoundland and Labrador Hydro
PB/177/2017A copy of the Report into the collapse of concrete framework at the Muskrat Falls Site reported to have occurred on May 29-30, 2016.04/24/2017Lower Churchill Project
PB/127/2017Any documentation or communications regarding compensation for Mark MacLeod, James Hillyard, Christopher Hickman, Ann Marie Hann, John Green, Brendan Paddick. 03/31/2017Nalcor Energy
PB/126/2017Any communication and documentation regarding a proposed name change for CF(L)Co. 03/31/2017Churchill Falls
PB/125/2017Any records pertaining to 'permafrost' and/or 'ground frost' and/or 'frozen ground' in Labrador. I am looking for records which include communications related to, information about or data relating to the above keywords. This request includes relevant information or communications by contractors such as Valard who did encounter frozen ground during transmission right-of-way construction in Labrador and during a comprehensive drilling program conducted across Labrador.

03/29/2017Lower Churchill Project
PB/62/2017A breakdown of all costs associated with the Muskrat Falls Protests from October 1 to present. 03/6/2017Lower Churchill Project
PB/849/2016Please provide a copy of the report into the collapse of concrete framework described by VP Gilbert Bennett "to look at all aspects of the work and understand what the root cause was". 12/28/2016Lower Churchill Project
PB/850/2016Please provide a copy of the revised or amended loan guarantee agreement with the federal government which extends the loan guarantee to $7.9 billion dollars for the NL component of the Muskrat Falls project. 12/28/2016Lower Churchill Project
PB/538/2016All emails sent to/from Paul Harrington between March 23, 2015 and April 3, 2015 inclusive related to the 2015 AGM or Astaldi.11/21/2016Lower Churchill Project
PB/537/2016All emails sent to/from Nalcor Energy board members between March 23, 2015 and April 3, 2015 inclusive related to the 2015 AGM or Astaldi.11/21/2016Lower Churchill Project
PB/547/2016Please provide copies of all reports on Muskrat Falls prepared by the independent engineer up to the present - clarified to only those reports not available on Nalcor website.11/21/2016Lower Churchill Project
PB/568/2016All contracts between Nalcor and Stantec between 2008-2014, including the dollar amounts paid in those contracts.11/21/2016Nalcor Energy
PB/567/2016A copy of the procedure for the removal of boiler ash which accumulates in the bottom of the heat chambers utilized in the burning of bunker C oil at the Holyrood generating station. In particular, a description of how the boiler ash is removed and disposed of, where the ash is taken after removal and all associated documentation which demonstrates that it is done in an environmentally sound manner in accordance with all environmental legislation.11/21/2016Newfoundland and Labrador Hydro
PB/531/2016All reports and analyses conducted by Wade Lock for Nalcor Energy and its subsidiaries.11/21/2016Nalcor Energy
PB/593/2016Please disclose how much nalcor paid for individual cottages during the transmission right of way acquisition. How was the amounts calculated?11/21/2016Lower Churchill Project
PB/613/2016I would like to request the 2015 and 2016 budgets for the 21 isolated electrical diesel power generation systems in the province including, but not limited to, the fuel usage and associated costs, labor expenses for both regular and overtime, repair and maintenance expenses, and the associated populations they support by station.11/21/2016Newfoundland and Labrador Hydro
PB/702/2016A copy of the report of the visit to Muskrat Falls by the Independent Engineer (MWH Global) which took place in July and was submitted in draft form September 20, 2016.11/21/2016Lower Churchill Project
PB/536/2016All emails sent to/from Gilbert Bennett Between March 23, 2015 and April 3, 2015 inclusive related to the 2015 AGM or Astaldi11/21/2016Lower Churchill Project
PB/797/2016Please advise which company was awarded the contract to complete the work for the Lower Churchill Muskrat Falls Hydroelectric Development CH0031 to Supply and Install Mechanical and Electrical Auxiliaries - HVAC. 11/18/2016Lower Churchill Project
PB-200-2016The name, job title and corresponding total taxable income for the 2015 tax year for all Nalcor Energy employees earning more than $100,000.09/2/2016Nalcor
PB/515/2016Copy of any 2014 report to the Board of Directors re: Code of Conduct and Business Ethics Compliance08/5/2016Nalcor Energy
PB/516/2016Lower Churchill contracts including estimated cost for each of the work packagaes at time contract was awarded and the actual cost of work upon completion.08/5/2016Nalcor Energy, Lower Churchill Project
PB/505/2016Copy of the guidelines for compensation and recovery of expenses for Nalcor Energy directors and directors of Nalcor subsidiary companies08/4/2016Nalcor Energy
PB/506/2016Contracts awarded and project cost updates in relation to the Muskrat Falls Project08/4/2016Nalcor Energy, Muskrat Falls, Lower Churchill Project
PB/499/2016List of Bonds and Treasury Bills issued by the Government and Nalcor Energy since December 14, 2015.08/1/2016Nalcor Energy
PB/477/2016Charge rate invoiced to Nalcor Energy for contractors through recruiting agencies provided to Nalcor on Muskrat Falls project.07/18/2016Nalcor Energy, Muskrat Falls, Lower Churchill Project
PB/402/2016Material prepared for the board of directors related to the termination of Ed Martin without cause, including but not limited to the legal opinion.07/14/2016Nalcor Energy
PB/467/2016Stan Marshall's employment contract.07/12/2016Nalcor Energy
PB/450/2016List of Nalcor employees, in addition to former CEO, who are eligible for supplementary executive retirement plan, along with a copy of the plan" as the summary.07/12/2016Nalcor Energy
PB/451/2016List of Nalcor employees covered by employment contracts with severance arrangements modelled on, or similar to, those contained in the contract with former CEO Ed Martin.07/12/2016Nalcor Energy
PB/404/2016All emails sent to/from any Nalcor Energy board members between Friday April 15 and Friday April 22 inclusive07/6/2016Nalcor Energy
PB/422/2016Ed Martin Settlement Agreement, Board minutes re Ed Martin termination/retirement, and, Ed Martin Incentive Plans.06/30/2016Nalcor Energy
PB/424/2016Mr. Martin's original contract dated 2005, along with his 2005 letter of appointment.06/30/2016Nalcor Energy
PB/320/2016Organization structure of the Lower Churchill Project, mode of employment of staff, listing of recruitment agencies used and the results of any internal audits.06/30/2016Nalcor Energy, Lower Churchill Project
PB/430/2016Final pricing of bids submitted for tender # 2016-66459VC" as the summary if you don't already have one.06/30/2016Nalcor Energy
PB/414/2016Correspondence between two individuals regarding the Muskrat Falls Project between July 2015 and May 27, 2016 and correspondence between several individuals regarding the Muskrat Falls Project and mercury/methylmercury between July 2010 and August 2011.06/29/2016Nalcor Energy, Lower Churchill Project
PB/412/2016Ed Martin's termination letter, correspondence regarding legal opinion on Mr. Martin's severance payment, and correspondence between Mr. Martin, the Nalcor Board and the Premier's office between April 1 and 21 relating to Mr. Martin's termination.06/29/2016Nalcor Energy
PB/417/2016Email correspondence between the Board and government and between the Board and Mr. Martin relating to Mr. Martin's termination and severance, with time-of-day date, over the period April 20, 2016 and May 5, 2016.06/29/2016Nalcor Energy
PB/411/2016A copy of the letter approving Ed Martin's severance payment, including signature06/29/2016Nalcor Energy
PB/421/2016Nalcor Energy By-Laws, rules governing stipends, remuneration or reimbursement of expenses paid to members of the Board of Directors of Nalcor and its subsidiaries, along with any severance arrangements.06/29/2016Nalcor Energy
PB/316/2016Employment contract between Nalcor Energy and Edmund Martin along with the severance or termination pay resulting from his retirement as announced April 20, 2016.05/20/2016Nalcor Energy
PB/317/2016Bonuses paid to Nalcor executives since January 1, 2016, records relating to Mr. Ed Martin's severance and a copy of Mr. Martin's employment contract.05/20/2016Nalcor Energy
PB/403/2016Legal opinion concerning the resignation or termination of Ed Martin05/20/2016Nalcor Energy
PB/416/2016Please advise when the severance payment to Mr. Martin was issued and whether approval or ratification by the new Board of Directors was granted. If it was granted, please advise the form taken by such ratification and whose signature appears on the instrument of ratification, including time-of-day dating.05/20/2016Nalcor Energy
PB/425/2016Please provide an allocation of Mr. Martin’s severance payment among the various lines of business of Nalcor Energy, including the amount which will be charged to ratepayers for power purchased from NL Hydro, both power purchased directly from NL Hydro, in regions of the province served directly by NL Hydro and for power sold to Newfoundland Power, for distribution to ratepayers within its service area.05/20/2016Nalcor Energy
PB/432/2016Details of all payments to Ed Martin on or since April 20, 2016.05/20/2016Nalcor Energy
PB/200/2016The name, job title and corresponding total taxable income for the 2015 tax year for all Nalcor Energy employees earning more than $100,000.04/5/2016Nalcor Energy
PB/172/2016Questions relating to the Muskrat Falls Financing.03/29/2016Nalcor Energy, Lower Churchill Project
PB/158/2016, PB/168/2016, PB/169/2016, PB/201/2016, PB/203/2016Geo-technical tests and reports relating to the North Spur03/23/2016Nalcor, atipp, Information
PB/159/2016Any and all drawings showing the location and details of all pump wells in the North Spur.02/24/2016Nalcor Energy, Lower Churchill Project
PB/38/2016Request for update of two Requests for Information which were filed with the Board of Commissioners of Public Utilities during the 2012 Muskrat Falls Review (page 6 of CA-KPL-Nalcor 27 Rev 1 and page 2 of PUB-Nalcor-5) based on most recent cost and load growth forecasts.01/19/2016Nalcor Energy, Lower Churchill Project
PB/576/2015Estimate of NL Hydro's revenue requirement for the first full year after commissioning of the Muskrat Falls Project and each of the subsequent 50 years, as well as wholesale rates and retail rates charged by Newfoundland Power.01/13/2016Nalcor Energy, Newfoundland and Labrador Hydro
PB/568/2015Current market value of the investments made by Nalcor in the oil and gas industry.12/3/2015Nalcor Oil & Gas
PB/519/2015Calculations supporting Ed Martin's claims that the Muskrat Falls Project will generate $60 billion in savings and revenue to the province over the next 50 years, including underlying fuel, load growth and return on equity assumptions.11/24/2015Nalcor Energy, Lower Churchill Project
PB/501/2015Updated interconnected electricity rates and interconnected consumer bill in 2018, 2020, 2025 and 2030 to reflect September 2015 project cost update.11/18/2015Nalcor Energy, Lower Churchill Project, Newfoundland and Labrador Hydro
PB/426/2015Historic and projected investments in oil & gas and dividends for the period of 2005-2026, including underlying assumptions for projections. Historic and projected investments in the Muskrat Falls project for the period of 2005-2068 as well as projected recoveries of the investment.09/22/2015Nalcor Energy, Lower Churchill Project, Nalcor Oil & Gas
PB/429/2015Historic and projected investments in oil & gas and dividends for the period of 2005-2026, including underlying assumptions for projections. Historic and projected investments in the Muskrat Falls project for the period of 2005-2068 as well as projected recoveries of the investment.09/22/2015Nalcor Energy, Lower Churchill Project, Nalcor Oil & Gas
PB/185/2015All records relating to the investment/participation in the multi-client TGS/PGS surveys including revenues, payments, agreements, communications, accounting records, income to Nalcor, return of capital/investment to Nalcor, sales information.07/3/2015Nalcor Energy, Nalcor Oil & Gas
PB/181/2015All legal fees paid by Nalcor for fiscal years 2012/13, 2013/14 and 2014/15, listed by firm.05/22/2015Nalcor Energy
PB/133/2015The amount of money spent on marketing and advertising in budget years 2013/14 and 2014/15, as well as a detailed breakdown of money spent on We Are Ready campaign.05/8/2015Nalcor Energy, Newfoundland and Labrador Hydro
PB-404-2018Request for Expressions of Interest and Proposals Lower Churchill Hydro Resource, January 200511/21/2018